Sa pansamantalang pagsasara ng southbound lane ng EDSA Kamuning flyover, four-wheeled vehicles at bisikleta na lamang ang nakadadaan sa service road. – Ulat ni Johnson Manabat, Patrol ng Pilipino
For more ABS-CBN News, click the link below:
https://www.youtube.com/playlist?list=PLgyY1WylJUmgG2ln-vtKXb-oLlGEZc3sR
To watch the latest updates on COVID-19, click the link below:
https://youtube.com/playlist?list=PLgyY1WylJUmgUjPkc730KnTVICyQU6gBf
Subscribe to the ABS-CBN News channel! - http://bit.ly/TheABSCBNNews
Watch the full episodes of TV Patrol on iWantTFC:
http://bit.ly/TVPatrol-iWantTFC
Visit our website at http://news.abs-cbn.com
Facebook: https://www.facebook.com/abscbnNEWS
Twitter: https://twitter.com/abscbnnews
#PatrolngPilipino
#LatestNews
#ABSCBNNews
ABS-CBN News
Run time: 03:28
Has AI Subtitles
* AI ("Artificial Intelligence") subtitles on Tagalog.com are generated using "Whisper" by OpenAI (the same company that created ChatGPT and DallE2). Results and accuracy may vary.
* The subtitles do include errors occasionally and should only be used as a tool to help with your listening practice.
* You can request this website to create a transcript for a video if one doesn't already exist by clicking the "Request AI Subtitles" button below a video. Transcribing usually takes 30-40% of the length of a video to complete if there are no other videos in
the queue. For example, a 21 minute video will take 7-8 minutes to transcribe.
* Running a super fast cloud GPU server to do these transcriptions does cost money. If you have the desire and financial ability, consider
becoming a patron
to support these video transcriptions, and the other tools and apps built by Tagalog.com
00:00.0
May 2, 2024 nitong Webes, maagang nag-inspeksyon sa flyover ang MMDA at DPWH
00:24.7
matapos simula nitong May 1 ang retrofitting ng higit tatlong dekadang tulay.
00:30.0
Dahil dito, siksika na mga pribadong sasakyan sa ibaba at ang mas problemado ay ang mga motorcycle rider na madalas dumadaan sa service road ng EDSA Kamuning.
00:41.5
Simula May 3 kasi, mga four-wheeled vehicle na lang ang papayagang dumaan sa service road para makabawa sa matinding traffic.
00:49.9
Sa ngayon po kasi sa aming count, 24,000 na four-wheeled vehicles po ang dumadaan dito sa Kamuning flyover at 23,000 na motor.
00:58.6
So yung 23,000 na motor na po yan na yan ay pagagamitin na po natin lahat ng alternatibong ruta.
01:08.6
Sabi ng MMDA, ang mananatiling bukas lamang ay ang EDSA busway.
01:14.7
Labagman sa kanilang kalooban, magahanap na nga lang ng alternatibong ruta ang mga rider na gaya ni Nariki at Dante.
01:22.0
Nakasel po siya kasi malaking bagay sa amin yung service road.
01:28.6
Siguro maghanap na ibang paraan na daan sir, kahit medyo malayo.
01:34.2
Importante sir kasi lahat naman ng ruta talaga sir, halos dito ang daan eh.
01:38.3
Hindi naman titikita ng MMDA ang mga motorcycle rider na dadaan dito.
01:43.5
Gagabayan na lang sila papunta sa mga alternate route.
01:47.5
So kung galing ng Quezon Avenue southbound, pwede nang kumanan sa kanto ng Panay Avenue o Mother Ignacia Avenue,
01:55.6
kaliwa sa Sgt. Esguerra Avenue at dire-direcho ng...
01:58.6
Na, sa kanto ng 11 Jamboree, palabas na ng Kamuning Road, patungong EDSA.
02:04.7
Pero, para sa mga motoristang no choice, kundi EDSA ang ruta,
02:10.5
Wala sir, tsaka lang. May alternate route, kaso malayo din ang ikot sir eh.
02:15.1
Mas sumaba lang sir, dahil nagsisiksikan kami dito sa ilalim eh.
02:19.2
Paliwanag ng DPWH, bukod sa Kamuning, may labing tatlo pang tulay at flyover sa Metro Manila
02:26.0
na tinukoy ng Japan International Cooperation Agency o JAICA
02:30.2
na kailangan ang kumpunihin bilang paghahanda sakaling tumama ang dabigwa na lindol.
02:36.6
Sinisimula na natin yung ating trabaho.
02:39.4
Nagkaroon na kami ng pagbubutas para ma-determine yung thickness ng aming slab.
02:44.5
At sa ngayon ay 24-7 na magtatrabaho yung ating contractor, 3 ships,
02:51.7
para masagurado at mapabilis po ang ating trabaho dito sa Kamuning Flyover.
02:56.0
Nagkakahalaga ang kontrata para dito ng higit 142 million pesos
03:02.6
at inaasahang matatapos ang buong proyekto sa Marso 2025.
03:08.9
Kaya ugaling magplano ng biyahe dahil ligtas ang may alam.
03:13.9
Parang iba yun ah.